
Alanya 2026: The Transformation of Atatürk Boulevard
Why Now is the Strategic Time to Invest in Alanya Center

The Vision
Alanya 2026: The Transformation of Atatürk Boulevard Why Now is the Strategic Time to Invest in Alanya Center
Alanya is entering a new era of urban excellence. The "Heart of the City"—Atatürk Boulevard—is currently undergoing its most significant infrastructure overhaul in over 40 years. This is not just a road project; it is a total "Prestige Street" modernization that will redefine property values and the quality of life in the district.
The project also includes a city-wide standardization of shop signs and "tabelas" to remove visual clutter and create a high-end European shopping atmosphere.
At Easy Apart Alanya, we believe informed investors make the best decisions. This project is a clear signal that the city center is evolving into a high-end, modern destination.
The "One Dig" Strategy 8 Projects, One Master Plan
The Alanya Municipality has coordinated with 8 different utility providers to ensure the street is only opened once. This "surgical" approach integrates all modern technologies simultaneously to prevent any future roadwork for years to come:
Preserving Heritage, Embracing Mobility
Iconic Palms & The Future Tramway
A key highlight of the 2026 Vision is the preservation of Alanya’s iconic Central Palm Trees. Every healthy tree is being protected, ensuring that while the technology is new, the green identity of the avenue remains.
Furthermore, the project includes a "Reserved Transport Corridor." This dedicated space is specifically designed for a future single-track light rail (Tram) system.
Investor Insight: By preparing the rail foundation now, Alanya is creating an eco-friendly transit corridor that will significantly boost local rental yields and property demand.


Key Milestones & Investor Impact
Key Milestones
-
Project Start: November 2025 (Beginning at the Alaaddin Keykubat Monument).
-
Current Status: Asphalt preparation is beginning. Large sections of Stages 1 & 2 have completed underground utility installation, and paving is scheduled to start in the coming weeks.
-
Target Completion: May 15, 2026 (Full asphalt and grand opening).
Why buy now?
Properties located in "Prestige Zones" like Atatürk Boulevard typically see a value increase of 15-20% upon completion of major urban beautification. Investing before May 2026 allows you to capture this growth before the market fully adjusts.
With the new Antalya-Alanya Motorway also under construction, travel from Antalya Airport is set to drop to just 36 minutes. The combination of this new road and the Atatürk Boulevard renovation makes Alanya Center the most high-growth investment zone in the Mediterranean.
Watch the Official Briefing
Alanya Mayor's Official Briefing:
The Modernization of Atatürk Avenue
Hear directly from Mayor Osman Tarık Özçelik regarding the transparency and technical goals of the Atatürk Avenue modernization. (Translate: "Alanya'nın Kalbi Yenileniyor")
Since the video is in Turkish, We have translated and structured the key points from Mayor Osman Tarık Özçelik's speech below.
[00:00]
The Need for Change
The Mayor explains that for many years, Atatürk Avenue and the coastal roads have been in desperate need of investment. During the summer months, the city has faced consistent failures in both the drinking water supply and the electrical grid due to outdated infrastructure.
[00:34]
The "One-Time Dig" Strategy
The most critical part of this project is the coordination of multiple service providers. The Mayor emphasizes that Alanya is moving away from "unplanned and wasteful" works. Instead of digging up the streets multiple times, all infrastructure companies were brought to a meeting to sync their schedules.
[01:19]
What is Being Installed Underground?
The Mayor lists the specific utilities being upgraded simultaneously in this single excavation:
-
ASAT: New drinking water lines to improve quality and pressure [01:31].
-
CK Enerji: New underground electrical lines and street lighting to prevent summer blackouts [01:31].
-
ENERYA: The arrival of the Natural Gas network into the city center [01:31].
-
Alanya Municipality: Advanced rainwater drainage systems to prevent street flooding [01:31].
-
Fiber Internet: New high-speed fiber optic lines for the entire district [01:43].
[01:55]
Project Phasing and Timeline
-
Start Date: The work officially began in the first week of November 2025.
-
Starting Point: Construction began at the Alaaddin Keykubat Monument (West) and is moving East toward the Atatürk Monument (City Center).
-
Traffic Management: The city is working closely with the Police Department to manage traffic flow and minimize the impact on local businesses [01:55].
[02:19]
The Mayor’s Message to Residents
-
The Mayor acknowledges that these works cause temporary inconvenience but asks for the public's patience. He explains that these "surgical" works are necessary to ensure that Alanya’s water doesn't fail, electricity stays on during the hottest summer days, and natural gas is ready for the future without having to break the roads again.
Summary of the Mayor's Briefing:
-
Solving Old Problems: The Mayor highlights that 45-year-old pipes are being replaced to end water and electricity cuts for good.
-
Efficiency: For the first time, all agencies (ASAT, CK Enerji, ENERYA) are working in total coordination.
-
Quality of Life: The goal is a "transparent and modern" city center where residents can enjoy better internet, cheaper heating, and more beautiful surroundings.
